{"id":2877,"date":"2026-03-12T06:37:23","date_gmt":"2026-03-12T06:37:23","guid":{"rendered":"https:\/\/www.rpe-engineering.com\/?page_id=2877"},"modified":"2026-03-13T02:08:37","modified_gmt":"2026-03-13T02:08:37","slug":"reka-experience","status":"publish","type":"page","link":"https:\/\/www.rpe-engineering.com\/index.php\/raga-project\/reka-experience\/","title":{"rendered":"PT. Reka Patria Ekaguna Project"},"content":{"rendered":"<p>[vc_row css=&#8221;.vc_custom_1773302418587{padding-top: 75px !important;}&#8221;][vc_column]\n    <div class=\" dustrial-stitle-6a2d246c14661 section-title text-left wow \">\n      <div class=\"section-thumb\"><img decoding=\"async\" src=\"https:\/\/www.rpe-engineering.com\/wp-content\/uploads\/2019\/01\/title-icon-1-2.png\" alt=\"title icon\"><\/div>\n      <div class=\"section-body\">\n        <h6 class=\"sub-title activeColor\">Our<\/h6>\n        <h3 class=\"m-0 main-title\">On Going Project<\/h3>\n      <\/div>\n    <\/div>\n\n  [vc_column_text]PT. Reka Patria Ekaguna is currently involved in several ongoing engineering projects supporting the energy and oil &amp; gas industries. These projects cover various engineering scopes, including engineering studies, Front-End Engineering Design (FEED), detailed engineering design, and project management services. With a strong commitment to quality, safety, and technical excellence, our team continues to work closely with clients to deliver reliable and efficient engineering solutions that support the successful execution of their projects.[\/vc_column_text][\/vc_column][\/vc_row][vc_row][vc_column width=&#8221;1\/4&#8243;][vc_column_text css_animation=&#8221;fadeIn&#8221;]<\/p>\n<h4 style=\"text-align: center;\">PROJECT NAME<\/h4>\n<p>[\/vc_column_text][\/vc_column][vc_column width=&#8221;1\/3&#8243;][vc_column_text css_animation=&#8221;fadeIn&#8221;]<\/p>\n<h4 style=\"text-align: center;\">SCOPE OF WORK<\/h4>\n<p>[\/vc_column_text][\/vc_column][vc_column width=&#8221;1\/4&#8243;][vc_column_text css_animation=&#8221;fadeIn&#8221;]<\/p>\n<h4 style=\"text-align: center;\">CLIENT<\/h4>\n<p>[\/vc_column_text][\/vc_column][vc_column width=&#8221;1\/6&#8243;][vc_column_text css_animation=&#8221;fadeIn&#8221;]<\/p>\n<h4 style=\"text-align: center;\">STATUS<\/h4>\n<p>[\/vc_column_text][\/vc_column][\/vc_row][vc_row][vc_column][vc_separator border_width=&#8221;3&#8243; css_animation=&#8221;bounceIn&#8221;][\/vc_column][\/vc_row][vc_row][vc_column width=&#8221;1\/4&#8243;][vc_column_text]<strong>Provision of Engineering Services<\/strong><\/p>\n<p>No. 343-CO-24[\/vc_column_text][\/vc_column][vc_column width=&#8221;1\/3&#8243;][vc_column_text]RPE\u2019s primary role is to provide engineering and support that ensures the integrity of COMPANY\u2019s starting design basis, technical standards, project schedule, budgets and safety standards are maintained during this Project phase.<\/p>\n<p>The following deliverables shall be required to be produced by RPE:<\/p>\n<ul>\n<li>Perform Detailed Engineering \u2013 level design work for all Facilities\/Unit\/System, producing the engineering technical deliverables required by COMPANY (including Basis of Design and Scope of Work) for COMPANY to issue further tenders for the associated work for the development contracts<\/li>\n<li>Provide specialized\/3rd party work including safety studies (HAZOP, HAZID, QRA, etc.), flow assurance, etc. as requested by COMPANY.<\/li>\n<li>Prepare the Requisition-Level Deliverables for the choses Long Lead Items. The Long Lead Items identification shall be developed based on the latest market survey report.<\/li>\n<li>Prepare Class 4 Cost Estimate for the associated work including TKDN calculation<\/li>\n<li>Prepare an overall Level 3 Project Schedule of the associated work, to evaluate the feasibility and viability of the Development and to perform various analysis, such as critical path, resource leveling, or what-if scenarios.<\/li>\n<\/ul>\n<p>[\/vc_column_text][\/vc_column][vc_column width=&#8221;1\/4&#8243;][vc_column_text]<\/p>\n<p style=\"text-align: center;\"><strong>JADESTONE ENERGY (LEMANG) PTE. LTD.<\/strong><\/p>\n<p>[\/vc_column_text][\/vc_column][vc_column width=&#8221;1\/6&#8243;][vc_column_text]<\/p>\n<p style=\"text-align: center;\">On-Going<\/p>\n<p>[\/vc_column_text][\/vc_column][\/vc_row][vc_row][vc_column width=&#8221;1\/4&#8243;][vc_column_text]<strong>Personnel Support Services for Engineering Work for E&amp;P Department<\/strong><\/p>\n<p>No. 20250096\/1070I\/CON\/HR&amp;IT\/VII\/DS[\/vc_column_text][\/vc_column][vc_column width=&#8221;1\/3&#8243;][vc_column_text]PT REKA PATRIA EKAGUNA provides Personnel Services for KANGEAN ENERGY INDONESIA LTD. for Rancak Field redevelopment in Pagerungan Kecil island, which consists of:<\/p>\n<ol>\n<li>Design of Rig Landing Facility &amp; Drilling Site Preparation. This scope covers study, calculation and drawing development for restoration of existing jetty facilities and Drilling Site Preparation (DSP) work in Pagerungan Kecil Island to support drilling operation activities as part of Rancak Field Redevelopment Project.<\/li>\n<li>EPCI AFE Document Preparation for Rancak Redevelopment Project<br \/>\nThis scope covers basic engineering design for facilities required to produce and transfer production fluid from Rancak Field in Pagerungan Kecil island to Pagerungan Gas Plant in Pagerungan Besar island, which includes:<\/p>\n<ul>\n<li>Rancak Wellpad in Pagerungan Kecil island<\/li>\n<li>Onshore Pipeline from Rancak Wellpad to jetty<\/li>\n<li>Offshore Pipeline from Pagerungan Kecil island jetty to Pagerungan Besar island<\/li>\n<li>Tie-in to PGB pipeline in Pagerungan Besar island to Pagerungan Gas Plant<\/li>\n<\/ul>\n<\/li>\n<\/ol>\n<p>[\/vc_column_text][\/vc_column][vc_column width=&#8221;1\/4&#8243;][vc_column_text]<\/p>\n<p style=\"text-align: center;\"><strong>KANGEAN ENERGY INTERNATIONAL LTD.<\/strong><\/p>\n<p>[\/vc_column_text][\/vc_column][vc_column width=&#8221;1\/6&#8243;][vc_column_text]<\/p>\n<p style=\"text-align: center;\">On-Going<\/p>\n<p>[\/vc_column_text][\/vc_column][\/vc_row][vc_row][vc_column width=&#8221;1\/4&#8243;][vc_column_text]<strong>Engineering Consultancy Services for BOP System for EPC PLTGU Batam#1 120 MW<\/strong><\/p>\n<p>No. 0005\/SPS\/725301-JO-BT1\/I\/2026<\/p>\n<p>[\/vc_column_text][\/vc_column][vc_column width=&#8221;1\/3&#8243;][vc_column_text]PT REKA PATRIA EKAGUNA provides Detail Engineering Design (DED) services for PT PP (PERSERO); as part of JO PP-ATAMORA-SPS; for project EPC PLTGU Batam#1 120 MW for PT PLN Batam, as project owner.<\/p>\n<p>For this Project, RPE will provide following services:<\/p>\n<ol>\n<li>Process &amp; Process Safety Engineering Services\n<ul>\n<li>Process design basis and fire protection design basis<\/li>\n<li>Process calculation for equipment, line sizing, utility consumption and hydraulic simulation<\/li>\n<li>Fire water demand calculation fire water pump and tank sizing<\/li>\n<li>Process datasheet for all equipment<\/li>\n<li>Water balance diagram and HMB<\/li>\n<li>PFD and P&amp;ID<\/li>\n<li>Safety Layout<\/li>\n<li>Line list, tie-in list and equipment list (including safety and fire fighting equipment list)<\/li>\n<\/ul>\n<\/li>\n<li>Electrical Engineering Services\n<ul>\n<li>Electrical calculation, single line diagram and electical layout for underground cable 150 kV<\/li>\n<li>Electrical calculation and datasheet<\/li>\n<li>Electrical equipment layout<\/li>\n<li>Cable tray, power wiring, grounding and lightning protection layout for general area, EAC building, HRSG-1, HRSG-2, transformer, 150kV AIS switchyard, 150kV AIS substation, BSEDG shelter, fuel gas metering, air compressor, cooling tower, STG building, admin building, workshop and warehouse, mosque, B3 storage, pump shelter, WTP area, and other building\/shelters.<\/li>\n<li>Load list and power &amp; control cable schedule<\/li>\n<li>Material take-off for Electrical<\/li>\n<\/ul>\n<\/li>\n<li>Instrumentation Engineering Services\n<ul>\n<li>Instrument and control design criteria<\/li>\n<li>Instrument and telecommunication specification and datasheet<\/li>\n<li>Instrument sizing and calculation<\/li>\n<li>Instrument, telecommunication and fire and gas detection layout and diagram<\/li>\n<li>Instrument index, I\/O list and cable schedule<\/li>\n<li>Material take-off for instrument<\/li>\n<li>Mechanical Engineering Services<\/li>\n<li>Mechanical specification for equipment<\/li>\n<li>Mechanical calculation for tanks and pressure vessels<\/li>\n<li>Mechanical datasheet for equipment<\/li>\n<li>Mechanical equipment list for BOP system<\/li>\n<\/ul>\n<\/li>\n<li>Piping Engineering Services\n<ul>\n<li>Piping design basis<\/li>\n<li>Piping specification and datasheet<\/li>\n<li>Pipe wall thickness calculationa and pipe stress analysis<\/li>\n<li>Overall plot plan, key plan and piping plan<\/li>\n<li>Detail piping layout and isometric drawing for GTG-1 and GTG-2 area, phosphate injection line, ammonia injection, condensate, drain, vent, sea water intake, water treatment, instrument and service air, fuel gas, fire water and other system.<\/li>\n<li>Material take-off for piping<\/li>\n<\/ul>\n<\/li>\n<\/ol>\n<p>[\/vc_column_text][\/vc_column][vc_column width=&#8221;1\/4&#8243;][vc_column_text]<\/p>\n<p style=\"text-align: center;\"><strong>Joint Operation <\/strong><br \/>\n<strong>PT PP (Persero) Tbk-PT Atamora Tehnik Makmur-PT Sinergi Pratama Sukses<\/strong><\/p>\n<p>[\/vc_column_text][\/vc_column][vc_column width=&#8221;1\/6&#8243;][vc_column_text]<\/p>\n<p style=\"text-align: center;\">On-Going<\/p>\n<p>[\/vc_column_text][\/vc_column][\/vc_row][vc_row][vc_column][vc_column_text]PT. Reka Patria Ekaguna continues to actively support various ongoing projects in the energy and oil &amp; gas industries. Through our engineering expertise and commitment to quality, safety, and reliability, we strive to deliver solutions that support the successful execution and long-term value of our clients\u2019 projects. For further information, project details, or business inquiries, please feel free to contact us.[\/vc_column_text][\/vc_column][\/vc_row][vc_row full_width=&#8221;stretch_row&#8221; el_class=&#8221;call-to-action bg-black-overlay&#8221; css=&#8221;.vc_custom_1773302378395{padding-top: 75px !important;padding-right: 0px !important;padding-bottom: 80px !important;padding-left: 0px !important;background-image: url(https:\/\/www.rpe-engineering.com\/wp-content\/uploads\/2020\/05\/dark-call-action-image.jpg?id=2236) !important;}&#8221;][vc_column]    <div class=\"call-to-action-sections style-two text-center\">\n            <div class=\"call_to_action_title wow fadeInUp\">\n        <h2>35+ years of experiences for give you better results.<\/h2>\n        <p>Reka Patria Ekaguna is a Engineering Company with the best quality and 35 years of experience.<\/p>\n      <\/div>\n              <div class=\"call_to_action_btns wow fadeInUp\">\n          <a href=\"https:\/\/www.rpe-engineering.com\/index.php\/contact-us\/\" class=\"btn call_to_action_btn\">Contact Us Today<\/a>\n        <\/div>\n          <\/div>\n  \n[\/vc_column][\/vc_row][vc_row css=&#8221;.vc_custom_1773303261830{padding-top: 30px !important;}&#8221;][vc_column css=&#8221;.vc_custom_1773293283727{padding-top: 20px !important;}&#8221;]\n    <div class=\" dustrial-stitle-6a2d246c14a19 section-title text-left wow \">\n      <div class=\"section-thumb\"><img decoding=\"async\" src=\"https:\/\/www.rpe-engineering.com\/wp-content\/uploads\/2019\/01\/title-icon-1-2.png\" alt=\"title icon\"><\/div>\n      <div class=\"section-body\">\n        <h6 class=\"sub-title activeColor\">Our<\/h6>\n        <h3 class=\"m-0 main-title\">Completed Project<\/h3>\n      <\/div>\n    <\/div>\n\n  [vc_column_text]PT. Reka Patria Ekaguna provides comprehensive engineering services to support the development and execution of projects in the energy and oil &amp; gas industries. Our capabilities cover the full engineering lifecycle, from conceptual studies and Front-End Engineering Design (FEED) to detailed engineering design and project management services. In addition, we offer a range of specialized engineering support including engineering studies, design review and verification, drafting and 3D modeling, provision of specialists, project cost estimation, CAPEX &amp; OPEX assessment, and other related engineering services, etc., ensuring efficient, reliable, and high-quality solutions tailored to our clients\u2019 needs.[\/vc_column_text][\/vc_column][\/vc_row][vc_row][vc_column width=&#8221;1\/4&#8243;][vc_column_text css_animation=&#8221;fadeIn&#8221;]<\/p>\n<h4 style=\"text-align: center;\">PROJECT NAME<\/h4>\n<p>[\/vc_column_text][\/vc_column][vc_column width=&#8221;1\/3&#8243;][vc_column_text css_animation=&#8221;fadeIn&#8221;]<\/p>\n<h4 style=\"text-align: center;\">SCOPE OF WORK<\/h4>\n<p>[\/vc_column_text][\/vc_column][vc_column width=&#8221;1\/4&#8243;][vc_column_text css_animation=&#8221;fadeIn&#8221;]<\/p>\n<h4 style=\"text-align: center;\">CLIENT<\/h4>\n<p>[\/vc_column_text][\/vc_column][vc_column width=&#8221;1\/6&#8243;][vc_column_text css_animation=&#8221;fadeIn&#8221;]<\/p>\n<h4 style=\"text-align: center;\">STATUS<\/h4>\n<p>[\/vc_column_text][\/vc_column][\/vc_row][vc_row][vc_column width=&#8221;1\/4&#8243;][vc_column_text]<strong>FEED BGP LLP<\/strong><\/p>\n<p>No. PCJ-3720-CA[\/vc_column_text][\/vc_column][vc_column width=&#8221;1\/3&#8243;][vc_column_text]PT REKA PATRIA EKAGUNA provides Front-End Engineering Design (FEED) Services for PETROCHINA INTERNATIONAL JABUNG LTD. for the development of new LLP system facilities which consists of:<\/p>\n<ul>\n<li>NEB #5 to NEB #10 12\u201d 6.6 km pipeline<\/li>\n<li>Gemah to BGP 12\u201d 15 km pipeline<\/li>\n<li>NEB #10 to BGP 16\u201d 5.2 km pipeline<\/li>\n<li>LLP slug catcher at BGP<\/li>\n<li>LLP gas compressors package at BGP<\/li>\n<li>LLP pumps and miscellaneous (fuel, flare, etc.) at BGP<\/li>\n<\/ul>\n<p>[\/vc_column_text][\/vc_column][vc_column width=&#8221;1\/4&#8243;][vc_column_text]<\/p>\n<p style=\"text-align: center;\"><strong>PETROCHINA INTERNATIONAL JABUNG LTD.<\/strong><\/p>\n<p>[\/vc_column_text][\/vc_column][vc_column width=&#8221;1\/6&#8243;][vc_column_text]<\/p>\n<p style=\"text-align: center;\">Completed<\/p>\n<p>[\/vc_column_text][\/vc_column][\/vc_row][vc_row][vc_column width=&#8221;1\/4&#8243;][vc_column_text]<strong>Provision of Engineering Services<\/strong><\/p>\n<p>No. 5010004248 &amp; 5010004249[\/vc_column_text][\/vc_column][vc_column width=&#8221;1\/3&#8243;][vc_column_text]RPE scope of services consists of general facility engineering services, deepwater engineering services and decommissioning engineering services, which include but not limited:<\/p>\n<ol>\n<li>Provision of operations engineering supports related to Company\u2019s existing facilities: Floating production facility (e.g. FPU West Seno and TLP-A), subsea facilities (export pipeline system, flexibe production flowline including its riser and flexible production jumpers, subsea production flowline and umbilical including risers) and onshore facilities at ORF Santan.<\/li>\n<li>Perform design verification and validation of existing facilities based on latest facilities\u2019 conditions and late life process operating conditions in order to maintain safe operations and compliance to process safety requirements.<\/li>\n<li>Perform necessary asset integrity engineering services and risk-based inspection engineering services.<\/li>\n<li>Provision of brownfield engineering services related with any upgrade or modification or refurbishment of existing facilities.<\/li>\n<\/ol>\n<p>[\/vc_column_text][\/vc_column][vc_column width=&#8221;1\/4&#8243;][vc_column_text]<\/p>\n<p style=\"text-align: center;\"><strong>Eni Makassar Ltd.,<\/strong><br \/>\n<strong>Eni Rapak Deepwater Ltd.,<\/strong><\/p>\n<p>[\/vc_column_text][\/vc_column][vc_column width=&#8221;1\/6&#8243;][vc_column_text]<\/p>\n<p style=\"text-align: center;\">Completed<\/p>\n<p>[\/vc_column_text][\/vc_column][\/vc_row][vc_row][vc_column width=&#8221;1\/4&#8243;][vc_column_text]<strong>PROVISION OF FEED MONOPOD \u201cA\u201d MPA RE-ACTIVATION, PACKAGE B: TOPSIDE FACILITIES &amp; IECST<\/strong><\/p>\n<p>No.: 026\/PEB\/LGL-PROC\/VI\/2024[\/vc_column_text][\/vc_column][vc_column width=&#8221;1\/3&#8243;][vc_column_text]PT Prima Energi Bawean has been entrusted with the operation of the Production Sharing Contract (PSC) Bawean Field at the Camar Marine Terminal. As part of their mandate, they are planning to reactivate the field, which comprises a range of production facilities. These include the Monopod \u201cA\u201d platform (MPA), the WHP Platform, the CPP Platform, pipeline connections, and other auxiliary facilities.<br \/>\nThis FEED, performed by PT Reka Patria Ekaguna, is for reactivation of the Bawean Field, and more specifically the MPA. The FEED deliverables will be used to:<\/p>\n<ul>\n<li>Set the design basis for execution for all engineering disciplines<\/li>\n<li>Establish and document design philosophies<\/li>\n<li>Develop and define all principal design parameters and set the basis for subsequent detailed engineering execution<\/li>\n<li>Perform site visit to MPA as to review existing topside facilities including but not limited to:<br \/>\nP&amp;ID<br \/>\nEquipment layout<br \/>\nSingle Line Diagram<br \/>\nPiping route<\/li>\n<li>Perform site visit to CPP as to find available space to place a new riser for incoming line from MPA as well as replacing topside flow line from incoming new riser.<\/li>\n<li>Develop a project execution (EPCI) schedule.<\/li>\n<li>Define project execution costs to an approximate +20% \/ -20% level of accuracy or advised by Contractor as normal industry standard.<\/li>\n<li>Prepare MTOs for LLI at an early stage in FEED in order for Company to consider placing an early Purchase Order prior to EPCI award.<\/li>\n<li>Prepare MTOs for topside facilities.<\/li>\n<li>The result of FEED shall produce approved for construction documents as to sufficiently allow company to tender for EPCI in a fast-track schedule.<\/li>\n<\/ul>\n<p>[\/vc_column_text][\/vc_column][vc_column width=&#8221;1\/4&#8243;][vc_column_text]<\/p>\n<p style=\"text-align: center;\"><strong>PT PRIMA ENERGI BAWEAN<\/strong><\/p>\n<p>[\/vc_column_text][\/vc_column][vc_column width=&#8221;1\/6&#8243;][vc_column_text]<\/p>\n<p style=\"text-align: center;\">Completed<\/p>\n<p>[\/vc_column_text][\/vc_column][\/vc_row][vc_row][vc_column width=&#8221;1\/4&#8243;][vc_column_text css_animation=&#8221;bounceIn&#8221;]<strong>DED untuk Proyek Peningkatan IFAS &amp; PAGA System dan Fasilitas Pendukung pada Sistem Keselamatan Tangki Timbun dan Fasilitas Produksi PHR<\/strong><\/p>\n<p>PO No. 0054\/WKS-PKU\/2402\/08.24[\/vc_column_text][\/vc_column][vc_column width=&#8221;1\/3&#8243;][vc_column_text css_animation=&#8221;bounceIn&#8221;]PT Reka Patria Ekaguna provides Detail Engineering Design (DED) services for PT Wahanakarsa Swandiri for upgrading project of Integrated Fire Alarm System (IFAS) and Public Announcement &amp; General Alaram (PAGA) system as part of fire protection system in PHR&#8217;s storage tank and production facilities, including installation of new Fire Water Pump and Jockey, in following area of operation:<\/p>\n<ul>\n<li>North area: Bangko GS, Balam GS, Pager GS, Benar GS<\/li>\n<li>Central area: Libo GS, Bekasap GS, Pungut GS, Petani GS, Pematang GS<\/li>\n<li>South area: Minas GS-1, Minas GS-2, Minas GS-3, Minas GS-4, Minas GS-5, Minas GS-6, Kotabatak GS, Petapahan GS<\/li>\n<\/ul>\n<p>[\/vc_column_text][\/vc_column][vc_column width=&#8221;1\/4&#8243;][vc_column_text css_animation=&#8221;bounceIn&#8221;]<\/p>\n<p style=\"text-align: center;\"><strong>PT WAHANAKARSA SWANDIRI (for PT PERTAMINA HULU ROKAN (PHR))<\/strong><\/p>\n<p>[\/vc_column_text][\/vc_column][vc_column width=&#8221;1\/6&#8243;][vc_column_text css_animation=&#8221;bounceIn&#8221;]<\/p>\n<p style=\"text-align: center;\">Completed<\/p>\n<p>[\/vc_column_text][\/vc_column][\/vc_row][vc_row][vc_column width=&#8221;1\/4&#8243;][vc_column_text css_animation=&#8221;bounceIn&#8221;]<strong>ENGINEERING DESIGN SERVICES<\/strong><\/p>\n<p>No. C1368257[\/vc_column_text][\/vc_column][vc_column width=&#8221;1\/3&#8243;][vc_column_text css_animation=&#8221;bounceIn&#8221;]To provide Engineering Design Services to support COMPANY\u2019s activities for the facility improvement project, in this following area:<\/p>\n<ul>\n<li>Perform design and\/or modification and\/or upgrade in such a manner that can maintain compatibility and integration between Company\u2019s new and existing surface Facilities.<\/li>\n<li>Provide engineering 2D drawings which include but not limited to: PFD\/P&amp;ID, piping plan, instrument lay-out, control room, equipment foundation, power cable lay-out, transformer tie-in details, piping isometric, building structure, etc.<\/li>\n<li>Provide engineering documents which include but are not limited to: study report, simulation report, equipment datasheet, equipment specification, materials take-off (MTO), etc.<\/li>\n<li>Provide 3D model which includes but not limited to: 3D model review report including SID assessment, auto generated MTO, auto generated piping isometric, etc.<\/li>\n<\/ul>\n<p>[\/vc_column_text][\/vc_column][vc_column width=&#8221;1\/4&#8243;][vc_column_text css_animation=&#8221;bounceIn&#8221;]<\/p>\n<p style=\"text-align: center;\"><strong>Eni Makassar Ltd., <\/strong><br \/>\n<strong>Eni Rapak Deepwater Ltd.,<\/strong><br \/>\n<strong>Eni Ganal Deepwater Ltd.<\/strong><\/p>\n<p>[\/vc_column_text][\/vc_column][vc_column width=&#8221;1\/6&#8243;][vc_column_text css_animation=&#8221;bounceIn&#8221;]<\/p>\n<p style=\"text-align: center;\">Completed<\/p>\n<p>[\/vc_column_text][\/vc_column][\/vc_row][vc_row][vc_column width=&#8221;1\/4&#8243;][vc_column_text css_animation=&#8221;bounceIn&#8221;]<strong>ENGINEERING SUPPORT FOR CONSTRUCTION, FABRICATION &amp; INSTALLATION CONTRACT FOR KSO RGA-MCI FOR JOB PMTS <\/strong>[\/vc_column_text][\/vc_column][vc_column width=&#8221;1\/3&#8243;][vc_column_text css_animation=&#8221;bounceIn&#8221;]PT Reka Patria Ekaguna (RPE) will provide various engineering services for Konsorsium PT Raga Perkasa Ekaguna \u2013 PT Mucoindo Prakarsa (KSO RGA-MCI) for Contract: PENYEDIAAN JASA CONSTRUCTION, FABRICATION, INSTALLATION for JOB PERTAMINA \u2013 MEDCO E&amp;P TOMORI SULAWESI, which include:<\/p>\n<ul>\n<li>DETAIL ENGINEERING DESIGN FOR MARINE BUILDING<\/li>\n<li>ENGINEERING SUPPORT UNTUK PEKERJAAN H2SO4 TANK-A MAJOR REPAIR<\/li>\n<li>ENGINEERING SUPPORT UNTUK MODIFIKASI &amp; UPGRADE FASILITAS EXISTING UNTUK PEMASANGAN LP HEATER<\/li>\n<li>ENGINEERING SUPPORT UNTUK READINESS ASSESSMENT FASILITAS PLN GAS RECEIVING METERING STATION<\/li>\n<li>TINDAK LANJUT FIELD ASSESSMENT FASILITAS PLN GAS RECEIVING &amp; METERING STATION<\/li>\n<li>PENYUSUNAN DOKUMEN AS-BUILT UNTUK PLOT PLAN CPP SENORO<\/li>\n<li>PENYUSUNAN DOKUMEN AS-BUILT UNTUK UNDERGROUND LAYOUT CPP SENORO<\/li>\n<li>LIGHTING &amp; ILLUMINATION DESIGN &amp; CALCULATION STREET AREA PAU METERING TO USO METERING<\/li>\n<li>ENGINEERING SERVICES FOR FACILITY REPAIR, MODIFICATION &amp; IMPROVEMENT &#8211; SITE SURVEY<\/li>\n<li>ENGINEERING SERVICES FOR FACILITY REPAIR, MODIFICATION &amp; IMPROVEMENT &#8211; STUDY &amp; WORK PACK PREPARATION<\/li>\n<\/ul>\n<p>[\/vc_column_text][\/vc_column][vc_column width=&#8221;1\/4&#8243;][vc_column_text css_animation=&#8221;bounceIn&#8221;]<\/p>\n<p style=\"text-align: center;\"><strong>Konsorsium PT Raga Perkasa Ekaguna \u2013 PT Mucoindo Prakarsa (KSO RGA-MCI)<\/strong><\/p>\n<p>[\/vc_column_text][\/vc_column][vc_column width=&#8221;1\/6&#8243;][vc_column_text css_animation=&#8221;bounceIn&#8221;]<\/p>\n<p style=\"text-align: center;\">Completed<\/p>\n<p>[\/vc_column_text][\/vc_column][\/vc_row][vc_row][vc_column width=&#8221;1\/4&#8243;][vc_column_text css_animation=&#8221;none&#8221;]<strong>DED FOR FACILITY DECONSTRAINT \u2013 PEMATANG &amp; PUNGUT (PHR)<\/strong><\/p>\n<p>WO No. 118245\/WO\/QPRA00\/07\/2024[\/vc_column_text][\/vc_column][vc_column width=&#8221;1\/3&#8243;][vc_column_text css_animation=&#8221;none&#8221;]PT Reka Patria Ekaguna provides Detail Engineering Design (DED) services for PT Raga Perkasa Ekaguna, as part of EPC contract for Facility Deconstraint in Pematang GS and Pungut GS for PT Pertamina Hulu Rokan (PHR) to increase production capacity in Pematang and Pungut area.<\/p>\n<p>Facility deconstraint activities in Pematang GS and Pungut GS will include:<\/p>\n<ul>\n<li>Installation of new Water Injection Pump (WIP), including vibration monitoring system<\/li>\n<li>Upgrade piping system inside GS (on-plot) and pipeline injection header (off-plot) as result of above additional WIP<\/li>\n<li>Upgrade control and instrumentation system<\/li>\n<li>Installation of additional electrical equipment required for above additional WIP<\/li>\n<\/ul>\n<p>[\/vc_column_text][\/vc_column][vc_column width=&#8221;1\/4&#8243;][vc_column_text css_animation=&#8221;none&#8221;]<\/p>\n<p style=\"text-align: center;\"><strong>PT BERCA ENGINEERING INTERNATIONAL<\/strong><\/p>\n<p>[\/vc_column_text][\/vc_column][vc_column width=&#8221;1\/6&#8243;][vc_column_text css_animation=&#8221;none&#8221;]<\/p>\n<p style=\"text-align: center;\">Completed<\/p>\n<p>[\/vc_column_text][\/vc_column][\/vc_row][vc_row][vc_column width=&#8221;1\/4&#8243;][vc_column_text css_animation=&#8221;none&#8221;]<strong>Engineering Support for Contract: Incountry Engineering Services and Onsite Drafting Services for PT Pertamina Hulu Rokan (PHR) <\/strong>[\/vc_column_text][\/vc_column][vc_column width=&#8221;1\/3&#8243;][vc_column_text css_animation=&#8221;none&#8221;]PT. Reka Patria Ekaguna (RPE) will provide various engineering services for PT Berca Engineering International (BEI) for Contract: Incountry Engineering Services and Onsite Drafting Services for PT Pertamina Hulu Rokan (PHR), which include:<\/p>\n<ul>\n<li>Hydraulic Simulation and Bottleneck Analysis for Rokan Wells Development 2022 (59 Wells in North, Central, Balam, Bangko, Seruni, Ubi, Manggala and Benar)<\/li>\n<li>FEED for Kotabatak GS Cooling System Optimization<\/li>\n<li>Engineering Design for Fire Protection System Upgrade in Duri &amp; PGT<\/li>\n<li>Engineering Design for Fire Protection System Upgrade in Central Area, Libo, Waduk GP, Bekasap, Pematang dan Petani<\/li>\n<li>Hydraulic Simulation and Bottleneck Analysis for 50 Wells Rokan Well Development 2023<\/li>\n<li>Hydraulic Simulation and Bottleneck Analysis for 100 Wells Rokan Well Development 2023 (Tahap-2)<\/li>\n<li>FEED OPLL Stage-2 Phase-4 Minas for PHR<\/li>\n<li>Hydraulic Simulation and Bottleneck Analysis for 100 Wells Rokan Well Development 2023 (Tahap-3)<\/li>\n<li>Hydraulic Simulation for Reactivation Wells RTP 2023 Project \u2013 Area South<\/li>\n<li>Hydraulic Simulation for Reactivation Wells RTP 2024 Project \u2013 Area South<\/li>\n<li>FEED Gas Engine Generator Minas<\/li>\n<li>FEED Penggantian Unit Minas Gas Turbine Tipe LA<\/li>\n<\/ul>\n<p>[\/vc_column_text][\/vc_column][vc_column width=&#8221;1\/4&#8243;][vc_column_text css_animation=&#8221;none&#8221;]<\/p>\n<p style=\"text-align: center;\"><strong>PT RAGA PERKASA EKAGUNA (for PT PERTAMINA HULU ROKAN (PHR))<\/strong><\/p>\n<p>[\/vc_column_text][\/vc_column][vc_column width=&#8221;1\/6&#8243;][vc_column_text css_animation=&#8221;none&#8221;]<\/p>\n<p style=\"text-align: center;\">Completed<\/p>\n<p>[\/vc_column_text][\/vc_column][\/vc_row][vc_row][vc_column width=&#8221;1\/4&#8243;][vc_column_text css_animation=&#8221;none&#8221;]<strong>Pekerjaan Detail Engineering Design (DED) pada Proyek Pekerjaan Awal Pembangunan Pabrik Peleburan (Smelter) Feronikel<\/strong><\/p>\n<p>No. 0191\/SPS\/SCM\/PP\/EPC\/719002\/XII\/2019[\/vc_column_text][\/vc_column][vc_column width=&#8221;1\/3&#8243;][vc_column_text css_animation=&#8221;none&#8221;]PT Reka Patria Ekaguna will provide Detail Engineering Design (DED) services for PT PP (Persero) Div. EPC for <em>Proyek Pekerjaan Awal Pembangunan Pabrik Peleburan (Smelter) Feronikel<\/em>, at Kolaka, for area under responsibility of PT PP (Persero).<\/p>\n<p>The DED will involve all related engineering disciplines (i.e. Process and Process Safety, Piping and Mechanical, Electrical, Civil, Structural and Architectural). The DED is including 3D modeling development utilizing AVEVA PDMS software.[\/vc_column_text][\/vc_column][vc_column width=&#8221;1\/4&#8243;][vc_column_text css_animation=&#8221;none&#8221;]<\/p>\n<p style=\"text-align: center;\"><strong>PT. PP (Persero) EPC Division (for PT <\/strong><br \/>\n<strong>CERIA NUGRAHA INDOTAMA)<\/strong><\/p>\n<p>[\/vc_column_text][\/vc_column][vc_column width=&#8221;1\/6&#8243;][vc_column_text css_animation=&#8221;none&#8221;]<\/p>\n<p style=\"text-align: center;\">Completed<\/p>\n<p>[\/vc_column_text][\/vc_column][\/vc_row][vc_row][vc_column width=&#8221;1\/4&#8243;][vc_column_text css_animation=&#8221;none&#8221;]<strong>Engineering Support for Tender Provision of EPCIC for Booster Compressors Installation for G2\/61 and G12\/48<\/strong><\/p>\n<p>No. WOMKT2023090001[\/vc_column_text][\/vc_column][vc_column width=&#8221;1\/3&#8243;][vc_column_text css_animation=&#8221;none&#8221;]RPE provide engineering support for PT IBC INDUSTRIAL CO. LTD. (IBCI) during tender of &#8220;Provision of EPCIC for Booster Compressors Installation for G2\/61 and G12\/48&#8221; for PTTEPI and PTTEP ED in the Gulf of Thailand. COMPANY decided to develop Booster compressors installation on the existing wellhead platforms which have depleted wells to prolong gas production. The booster compressors installation is planned as below locations:<\/p>\n<ul>\n<li>WP4, WP23 and WP25 at G2N.<\/li>\n<li>WPS2, WPS3, WPS5, WPS6 and WPS15 at G2S.<\/li>\n<li>WPS16 at G12\/48<\/li>\n<li>WPS8 at G2S (optional)<\/li>\n<\/ul>\n<p>RPE will review, verify and update the engineering dossier which CLIENT has received from COMPANY and will develop some documents as necessary for tender purpose.[\/vc_column_text][\/vc_column][vc_column width=&#8221;1\/4&#8243;][vc_column_text css_animation=&#8221;none&#8221;]<\/p>\n<p style=\"text-align: center;\"><strong>IBC INDUSTRIAL CO. LTD.<\/strong><\/p>\n<p>[\/vc_column_text][\/vc_column][vc_column width=&#8221;1\/6&#8243;][vc_column_text css_animation=&#8221;none&#8221;]<\/p>\n<p style=\"text-align: center;\">Completed<\/p>\n<p>[\/vc_column_text][\/vc_column][\/vc_row][vc_row][vc_column width=&#8221;1\/4&#8243;][vc_column_text css_animation=&#8221;none&#8221;]<strong>ENGINEERING DESIGN SERVICES<\/strong><\/p>\n<p>No. C1368257[\/vc_column_text][\/vc_column][vc_column width=&#8221;1\/3&#8243;][vc_column_text css_animation=&#8221;none&#8221;]To provide Engineering Design Services to support COMPANY\u2019s activities for the facility improvement project, in this following area:<\/p>\n<ul>\n<li>Perform design and\/or modification and\/or upgrade in such a manner that can maintain compatibility and integration between Company\u2019s new and existing surface Facilities.<\/li>\n<li>Provide engineering 2D drawings which include but not limited to: PFD\/P&amp;ID, piping plan, instrument lay-out, control room, equipment foundation, power cable lay-out, transformer tie-in details, piping isometric, building structure, etc.<\/li>\n<li>Provide engineering documents which include but are not limited to: study report, simulation report, equipment datasheet, equipment specification, materials take-off (MTO), etc.<\/li>\n<li>Provide 3D model which includes but not limited to: 3D model review report including SID assessment, auto generated MTO, auto generated piping isometric, etc.<\/li>\n<\/ul>\n<p>[\/vc_column_text][\/vc_column][vc_column width=&#8221;1\/4&#8243;][vc_column_text css_animation=&#8221;none&#8221;]<\/p>\n<p style=\"text-align: center;\"><strong>PT Pertamina Hulu Rokan<\/strong><\/p>\n<p>[\/vc_column_text][\/vc_column][vc_column width=&#8221;1\/6&#8243;][vc_column_text css_animation=&#8221;none&#8221;]<\/p>\n<p style=\"text-align: center;\">Completed<\/p>\n<p>[\/vc_column_text][\/vc_column][\/vc_row][vc_row][vc_column][vc_column_text]For a more comprehensive overview of PT. Reka Patria Ekaguna\u2019s engineering experience and project portfolio, please download the complete list of our completed projects through the link below. This document highlights our capabilities, technical expertise, and track record in delivering high-quality engineering solutions for various clients in the energy and oil &amp; gas industries.<\/p>\n<p><a href=\"https:\/\/rpeengineering-my.sharepoint.com\/:b:\/g\/personal\/sidiq_rpe-engineering_com\/IQCrMvOtntOgSYAM82isPeKMAdq5pLFhXmx_CvO_U6cD3Aw\" target=\"_blank\" rel=\"noopener noreferrer\">Download Our Completed Project List<\/a>[\/vc_column_text][\/vc_column][\/vc_row]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[vc_row css=&#8221;.vc_custom_1773302418587{padding-top: 75px !important;}&#8221;][vc_column][vc_column_text]PT. Reka Patria Ekaguna is currently involved in several ongoing engineering projects supporting the energy and oil &amp; gas industries. These projects cover various engineering scopes, including engineering studies, Front-End Engineering Design (FEED), detailed engineering design, and project management services. With a strong commitment to quality, safety, and technical excellence, our team [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":371,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"page-template\/blank-page-sidebar.php","meta":{"footnotes":""},"class_list":["post-2877","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/www.rpe-engineering.com\/index.php\/wp-json\/wp\/v2\/pages\/2877","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.rpe-engineering.com\/index.php\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.rpe-engineering.com\/index.php\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.rpe-engineering.com\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.rpe-engineering.com\/index.php\/wp-json\/wp\/v2\/comments?post=2877"}],"version-history":[{"count":53,"href":"https:\/\/www.rpe-engineering.com\/index.php\/wp-json\/wp\/v2\/pages\/2877\/revisions"}],"predecessor-version":[{"id":2928,"href":"https:\/\/www.rpe-engineering.com\/index.php\/wp-json\/wp\/v2\/pages\/2877\/revisions\/2928"}],"up":[{"embeddable":true,"href":"https:\/\/www.rpe-engineering.com\/index.php\/wp-json\/wp\/v2\/pages\/371"}],"wp:attachment":[{"href":"https:\/\/www.rpe-engineering.com\/index.php\/wp-json\/wp\/v2\/media?parent=2877"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}