EPCI of Mila-A & Asti-A Platforms and Offshore Pipelines

COMPANY plans to develop Mila-A and Asti-A gas fields to supplement production to BWA which is the existing primary gas production in the central area.

  • Mila-A Gas Field is about 7.2 km away from BWA
  • Asti-A Gas Field is about 6.6 km away from BWA

New Braced Monopod Well Head Platforms are to be developed for both Mila-A and Asti-A including subsea pipelines to deliver Mila-A and Asti-A production to the BWA platform.

  • Platform type   : Braced Monopod
  • Topside Weight  : +/- 500 MT
  • Water Depth  : +/- 70 ft
  • Conductor  : 3 (Mila-A) & 2 (Asti-A)
  • Pipeline Mila – BWA  : 10” OD,  +/7.5 Km
  • Pipeline Asti – BWA  : 10” OD, +/- 7 Km

Contractor Scope of Work:

  • Mila-A Braced Monopod Well Head Platform
  • Asti-A Braced Monopod Well Head Platform
  • 10-inch gas export carbon steel pipeline including risers from MILA-A Platform to BWA Platform
  • 10-inch gas export carbon steel pipeline including risers from Asti-A Platform to BWA Platform
  • BWA Platform modification