single page feature image

    Contact Info

  • Gandaria 8 Office Tower 5th Floor
  • +62 290 36 500
  • marketing@rpe-engineering.com

Transportation and Installation (T&I) Works for Offshore Wellhead Platform(OWF) for TEMBIKAI NON ASSOCIATED GAS (TNAG)

VESTIGO PETROLEUM, SDN. BHD. – Transportation and Installation (T&I) Works for Offshore Wellhead Platform(OWF) for TEMBIKAI NON ASSOCIATED GAS (TNAG)

  • Platform type   : ZEEPOD
  • Topside Weight  : +/- 400 MT
  • Subsea Template Weight  : +/- 300 MT
  • Sleeve Guide Weight  : +/- 36 MT
  • Top Sleeve Weight  : +/- 180 MT
  • Water Depth  : +/- 71.2 m
  • Caisson  : 60” Dia
  • Conductor  : 36” Dia
  • Raker Pile  : 36” Dia

Scope of Work :

  • Project Management Team
  • Transportation & Installation Engineering